Gas Field Soil & Groundwater Contamination Investigation, Bahrain

An Environmental Site Assessment (ESA) of a gas plants weathering pits. The ESA was carried out in two main phases; the first phase comprised trial pit digging and the second phase was the site investigation. The objective the study was to establish a representative data set on soil and groundwater quality to determine whether or not groundwater was impacted by the operation of the two onsite weathering pits. Air quality measurements were also carried out using a landfill gas monitor.