• Industry

    Environmental Improvement Programme, Bahrain

    An internal environmental assessment of the Arab Shipbuilding & Repair Yard’s ongoing and future planned operations.  The appointment follows the Supreme Council for Environment’s instructions to ASRY to follow new environmental requirements.

  • Industry

    Pellet Plant EIA and EMP, Bahrain

    An EIA of a proposed Pellet Plant Project located adjacent to the existing Iron Ore Pelletizing Plant in the Hidd Industrial Area. The EIA was carried out for both the construction and operational phases of the plant and included specialist studies such as air quality dispersion modelling (using AERMOD), to

  • Industry

    Integrated Steel Complex EHIA, Bahrain

    An Environmental Impact Assessment for the construction and operation of an integrated steel complex on land adjacent to existing iron ore pelletizing plants and a stainless steel rolling mill plant within the Hidd Industrial Area in Bahrain. The Bahraini government required that an appropriate assessment of the potential effects on

  • Industry

    Waste to Energy Plant EIA, Bahrain

    An Environmental Impact Assessment (EIA) of a proposed Waste to Energy (WtE) Plant. Included in the EIA were specialist studies particularly air quality modelling using ADMS Urban.  ADMS Urban is a computer based model that can be used in conjunction with a Geographical Information System to quantify atmospheric emissions from