• Dredging and Reclamation

    Dredging and Reclamation EIA, Bahrain

    An EIA of a proposed mixed use development known as Nurana development, an 860,651m² plot 600 m offshore of Karranah village. The development was proposed partly on low-lying fasht of importance to local fisheries and partly in deeper water offshore, close to the World Heritage Site of Qal’at al Bahrain.

  • Dredging and Reclamation

    Dredging and Reclamation EIA, Bahrain

    An Environmental Impact Assessment for the dredging and land reclamation phase of the Manama Lagoon Project, located between Manama and Muharraq. The proposed development is designated mainly for residential use and will include several hotels, shops and civic / cultural amenities. The study looked at marine baseline conditions and included

  • Dredging and Reclamation

    Marine Dredging EIA, Bahrain

    An EIA for the dredging of two proposed Borrow Areas referred to as borrow areas ‘D’ and ‘R’ located to the south west of the Arab Shipbuilding and Repair Yard in the Kingdom of Bahrain. A comprehensive Marine Baseline Survey was undertaken which included drop down video surveys, dive surveys

  • Dredging and Reclamation

    Oil and Gas Terminal Reclamation EIA, Bahrain

    An EIA for a proposed reclamation platform for a new terminal facility to be located north of the Bapco Causeway and Sitra Wharf. The proposed reclamation is part of a strategic masterplan for the area, driven by the Ministry of Housing. As the project involved reclamation from the sea, the

  • Dredging and Reclamation

    Beach Resort Reclamation, CEMP, Bahrain

    A Construction Environmental Management Plan to address the reclamation and beach works associated with the development. In October 2014, Environment Arabia conducted weekly audits of the land reclamation and beach works until their final completion in August 2015.